Does Role Clarity moderate between Project stakeholders and success? Exploring the relationship between Project stakeholders and success in Punjab Pakistan.

Authors

  • Muhammad Sajid Bahria University image/svg+xml
  • M.Abrar Ahmad
  • Saif Ur Rehman
  • Rabia Abrar
  • M.Mohsin Rashid

DOI:

https://doi.org/10.31580/jpvai.v5i1.2462

Keywords:

Sub- Contractors Involvement, Project success, Supplier/Vendor Innovativeness, Role of Clarity

Abstract

A predominantly quantitative research strategy from 187 respondents who working in construction firms in Lahore (Pakistan). A questionnaire survey was conducted with project managers from construction companies in Lahore, Pakistan. Measurement and structural models were developed for stakeholder management and project success measures by using Process Macro. The results show a positive and significant direct relationship between Internal & External stakeholders over project success. The finding of this research shows that Resident Engineer, Role of Clarity, and Supplier/Vendor have a positive significant relationship with project success, while Subcontractor has an insignificant relationship with project success. Findings of this research also show that Role of Clarity moderates significantly between Resident Engineer and Project success and between Supplier/Vendor and project success. Findings of this research also show that the Role of Clarity moderates in-significantly between Subcontractors and project success. Study findings are very useful for construction projects strategy makers, internal and external stakeholders, and for policymakers.

References

Amirhossein Heravi, Vaughan Coffey, Bambang Trigunarsyah. (2015). Evaluating the level of stakeholder involvement during the project planning processes of building projects. International journal of project management, 33(2015) 985-997.

Ann T.W. Yu a, Qiping Shen, John Kelly, Kirsty Hunter. (2007). An empirical study of the variables affecting construction project briefing/architectural programming. International journal of project management, 25(2007) 198-212.

Anwar, S., Tawab,R., Kinza, Sami, A. (2020). A Systematic Review Of Impact Of Employee Engagement On Organizational Performance. Systematic Literature Review and Meta-Analysis Journal 1 (1), 1-6

Bingsheng Liu, Yan Li, Bin Xue, Qian Li, Patrick X.W. Zou, Ling Li. (2018). Why do individuals engage in collective actions against major construction projects? —An empirical analysis based on Chinese data. International journal of project management, 36(2018) 612-626.

Claus Beringer, Daniel Jonas, Alexander Kock. (2013). The behavior of internal stakeholders in project portfolio management and its impact on success. International journal of project management, 31(2013) 830-846.

Francesco Di Maddaloni, Kate Davis,(2017). Project manager's perception of the local communities' stakeholders in megaprojects. An empirical investigation in the UK. International journal of project management, (2017).

Gilberto Francisco de Oliveira, Roque Rabechini Jr.(2019). Stakeholder management influence on trust in a project: A quantitative study. International journal of project management, 37(2019) 131-144.

Goodenough D. Oppong, Albert P.C. Chan, Ayirebi Dansoh. (2017). A review of stakeholder management performance attributes in construction projects. International journal of project management, 35(2017) 1037-1051.

Hemanta Doloi, K.C. Iyer, Anil Sawhney. (2011). Structural equation model for assessing impacts of contractor's performance on project success. International journal of project management, 29(2011) 687-695.

Jaman I. Alzahrani, Margaret W. Emsley. (2013). The impact of contractors’ attributes on construction project success: A post-construction evaluation. International journal of project management,31(2013) 313-322.

Jing Yang, Geoffrey Qiping Shen, Manfong Ho, Derek S. Drew, Xiaolong Xue. (2011). Stakeholder management in construction: An empirical study to address research gaps in previous studies. International journal of project management, 29(2011) 900-910.

Ka Yan Mok, Geoffrey Qiping Shen, Jing Yang. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International journal of project management, 33(2015) 446-457.

Kate Davis. (2016). A method to measure success dimensions relating to individual stakeholder groups. International journal of project management, 34(2016) 480-493.

Marly M. Carvalho, Roque Rabechini Jr. (2017). Can project sustainability management impact project success? An empirical study applying a contingent approach. International journal of project management, (2017).

Nora M. El-Gohary, Hesham Osman, Tamer E. El-Diraby. (2006). Stakeholder management for public-private partnerships. International journal of project management, 24(2006) 595-604.

Ralf Müller, Li Zhai, Anyu Wang. (2017). Governance and governmentality in projects: Profiles and relationships with success. International journal of project management, (2017).

Rehman, S., Sami, A., Haroon, A., & Irfan, A. (2019). Impact of Sustainable Leadership Practices on Public Sector Organization: A systematic Review of Past Decade. Journal of Public Value and Administration Insights, 2(3), 1-5.

Robert Joslin, Ralf Müller. (2016). The relationship between project governance and project success. International journal of project management, 34(2016) 613-626.

S. Thomas Ng, Ziwei Tang, Ekambaram Palaneeswaran. (2009). Factors contributing to the success of equipment-intensive subcontractors in construction. International journal of project management, 27 (2009) 736–744.

S. Thomas Ng, Ziwei Tang. (2010). Labor-intensive construction sub-contractors: Their critical success factors. International journal of project management, 28(2010) 732-740.

Saeed Banihashemi, M. Reza Hossein, Hamed Golizadeh, Shankar Sankaran. (2017). Critical success factors (CSFs) for the integration of sustainability into construction project management practices in developing countries. International journal of project management, (2017).

Samiaah M. Hassen M. Al-Tmeemy, Hamzah Abdul-Rahma, Zakaria Harun. (2011). Future criteria for success of building projects in Malaysia. International journal of project management, 29(2011) 337-348.

Shamas-ur-Rehman Toor, Stephen O. Ogunlana. (2008). Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry. International journal of project management, 26(2008) 420-430.

Xiaojin Wang, Jing Huang. (2006). The relationships between key stakeholders project performance and project success: Perceptions of Chinese construction supervising engineers. International journal of project management, 24(2006) 253-260.

Downloads

Published

2022-03-29

Issue

Section

Research Article

How to Cite

Does Role Clarity moderate between Project stakeholders and success? Exploring the relationship between Project stakeholders and success in Punjab Pakistan. (2022). Journal of Public Value and Administrative Insight, 5(1), 37-46. https://doi.org/10.31580/jpvai.v5i1.2462

Most read articles by the same author(s)

Similar Articles

11-20 of 41

You may also start an advanced similarity search for this article.